Our News

Case Studies

River Extract Pump Installation

Picture 2 shows the old line shaft lift pumps. These pumps transfer the river water to the surrounding reservoirs to the west of London. As part of the upgrade works

Read More >>
Case Studies

Water Treatment Works

As part of the major upgrade works along the river Thames, CovElec undertook the complete mechanical upgrade to various sites owned by Affinity Water. These drinking water extract works incorporated the upgrade to fish

Read More >>
Case Studies

Fruit, Nut & Seed Health Bar Production Line

A Leicester based bakery needed to automate the production of health bars for major high street brands.    CovElec have been commissioned to design and build an extrusion line with integrated cutter. The system is PLC

Read More >>
Case Studies

Tray Baked Flapjack Line

This turnkey project, designed, manufactured and installed by CovElec to the clients specification and requirement to fill baking trays with oats and syrup at a rate of 450 trays per

Read More >>

Inefficient pump: fix or replace?

Should you repair or replace an inefficient pump? Weighing the factors involved in this decision involves considering the wider process and supply chain context. By Steed Webzell for Operations Engineer 

Read More >>

New Exeter Branch Opens!

We’ve moved! New Branch – New Location After successfully growing the business year on year it was time for our Exeter team to move to bigger premises to keep up

Read More >>